Skip to content
Fast, Free Shipping On All Orders Over $100
Call or Text Today!

(866) 689-0086

Clear Comfort CCW500 AOP System for Large Commercial Pools & Water Parks

$35,960.00

✓ Fast, Free Shipping On Orders Over $100
✓ Sales Tax Only In CA
✓ Full Manufacturer Warranty
✓ Need Help Before Ordering? Give us a call
(866) 689-0086

Install Kits

Notify me when back in stock

Clear Comfort CCW500 Commercial AOP System

The Clear Comfort CCW500 is a hydroxyl-based Advanced Oxidation Process supplemental sanitation system designed for large commercial pools, water parks, aquatic centers, and other high-demand recreational-water facilities.

With treatment capacity for circulation flow rates up to 2,000 GPM, the CCW500 helps reduce chlorine demand, combined chlorine, chemical odors, and other disinfection by-products while supporting clearer water and a more comfortable aquatic environment.

The CCW500 operates alongside the facility’s required primary sanitizer, filtration, and circulation systems.

Why You’ll Love It

  • Designed for large commercial pools and water parks
  • Treats circulation flow rates up to 2,000 GPM
  • Patented hydroxyl-based AOP technology
  • Helps reduce chlorine and other chemical consumption
  • Helps control combined chlorine and disinfection by-products
  • Supports improved water and surrounding air quality
  • Helps protect against chlorine-resistant contaminants
  • Dual-cartridge design for increased treatment capacity
  • Works alongside existing primary sanitation systems
  • Inline diffuser, surge-pit diffuser, or Venturi installation options
  • Floor-standing commercial enclosure
  • Annual 15-minute cartridge exchange
  • Low 120-watt power consumption
  • NSF/ANSI 50 certified
  • UL certified
  • EPA establishment registered
  • Made in the USA
  • Five-year limited system warranty
  • Eligible for Clear Comfort’s pre-registered 90-day money-back guarantee

Commercial Supplemental Sanitation

The CCW500 supplements the facility’s required chlorine, bromine, or other approved primary sanitizer.

Clear Comfort’s patented AOP technology generates hydroxyl radicals that oxidize contaminants introduced by swimmers and the surrounding environment. This helps reduce the oxidation burden placed on the facility’s primary sanitizer.

The system can help address:

  • Organic contaminants
  • Combined chlorine
  • Chloramine-related odors
  • Oils and lotions
  • Other oxidizable contaminants
  • Disinfection by-products
  • Chlorine-resistant microorganisms

Required sanitizer residuals, turnover rates, filtration, testing, recordkeeping, and operational procedures must continue to comply with applicable health-code requirements.

Best Applications

The CCW500 is designed for large, heavily used commercial aquatic facilities, including:

  • Large commercial swimming pools
  • Water parks
  • Municipal aquatic centers
  • University and school aquatic facilities
  • Recreation centers
  • YMCAs and health clubs
  • Large hotel and resort pools
  • Competition pools
  • Professional athletic training facilities
  • Large therapy and rehabilitation pools
  • High-bather-load indoor pools
  • Commercial water attractions

Final system selection should account for circulation flow, water volume, turnover rate, bather load, operating hours, sanitizer demand, facility design, and installation method.

System Specifications

  • Model: CCW500
  • Application: Large commercial pools and water parks
  • Technology: Hydroxyl-based Advanced Oxidation Process
  • Maximum treated water flow: 2,000 GPM
  • Recommended treatment-air flow: 40–55 LPM
  • Electrical supply: 120V or 240V, 60 Hz
  • Electrical rating at 120V: 2.5A
  • Electrical rating at 240V: 1.25A
  • Approximate power consumption: 120 watts
  • Current-sensor operating range: 0.25A–15A
  • Dimensions: 47 inches high × 36 inches wide × 27 inches deep
  • Weight: Approximately 90 lb.
  • Mounting configuration: Floor standing
  • Included power cord: 10 feet
  • Recommended ambient temperature: 40°F–90°F
  • Maximum recommended distance from injection point: 15 feet
  • Country of manufacture: USA

The CCW500 should operate only while the facility’s circulation pump is running.

Dual-Cartridge Commercial Design

The CCW500 uses two treatment cartridges to provide the capacity required for large-scale aquatic applications.

The commercial enclosure includes:

  • Cartridge A
  • Cartridge B
  • Individual cartridge-status indicators
  • System power switch and indicator
  • Internal power supply
  • Voltage-specific ballasts
  • Current sensor
  • External adjustable flowmeter
  • Treated-air outlet
  • Lockable front doors

Both cartridges must be correctly installed, powered, and connected for the system to operate as designed.

The dual-cartridge layout also provides built-in treatment redundancy compared with a single-cartridge configuration.

Chlorine and Disinfection By-Product Reduction

Clear Comfort positions its commercial systems to help facilities:

  • Reduce chlorine and other chemical use
  • Improve control of combined chlorine
  • Reduce irritating chemical odors
  • Reduce unwanted disinfection by-products
  • Improve water clarity
  • Improve swimmer and staff comfort
  • Reduce chemical handling and storage demands
  • Stabilize overall water-care operation

Clear Comfort reports commercial chemical reductions of up to approximately 50% and disinfection by-product reductions of approximately 50%–90% in qualifying applications.

These are manufacturer-reported results rather than guaranteed outcomes. Actual performance depends on system sizing, installation, chemistry, filtration, circulation, bather load, operating procedures, and facility conditions.

Supplemental Protection Against Cryptosporidium

Clear Comfort reports third-party university testing demonstrating a 99.99% reduction of chlorine-resistant Cryptosporidium under the tested conditions.

The CCW500 remains a supplemental sanitation system. It does not eliminate the need to maintain the required primary sanitizer or follow applicable health-department procedures for contamination events, fecal incidents, testing, closure, or remediation.

Flexible Installation Options

The CCW500 can be integrated through several commercial injection methods:

  • Inline diffuser rod
  • Surge-pit diffuser
  • Venturi injection
  • Air-compressor-assisted injection

The correct method depends on the facility’s hydraulic design, return-pipe configuration, circulation flow, surge-pit layout, available space, and equipment-room conditions.

Clear Comfort or a qualified commercial aquatic professional should review the proposed application before the system and installation kit are ordered.

Inline Diffuser Installation

An inline diffuser installation introduces treated air directly into the main return plumbing.

The diffuser and flow switch are generally installed after the filter and heater, with the greatest practical distance from the chlorine-injection location.

A typical inline installation kit may include:

  • Diffuser rods
  • Air check valves
  • Air tubing
  • Air-compressor enclosure
  • Flow switch
  • Junction box
  • Flowmeter
  • Plumbing tools and installation components

The flow switch helps prevent the CCW500 from operating when circulation flow is not present.

The CCW500 should generally be positioned within 15 feet of the injection point, and air tubing should be kept as short and direct as practical.

Surge-Pit Diffuser Installation

Facilities equipped with a surge pit may introduce treated air through submerged diffuser assemblies.

For the CCW500, multiple diffusers are connected to the system through a splitter configuration.

Diffusers should generally be positioned:

  • Near the location where water enters the surge pit
  • Away from the circulation-pump suction
  • Where bubbles can disperse effectively
  • Where tubing can be protected from damage
  • Where components remain accessible for inspection and service

Surge-pit designs differ substantially between facilities. Clear Comfort should review the proposed diffuser quantity, placement, tubing route, and equipment configuration before installation.

Typical Plumbing Sequence

For an inline commercial installation, the general equipment sequence is:

Pool → Pump → Filter → Heater → Clear Comfort Injection Point → Chlorine Injection → Return to Pool

The Clear Comfort injection point should generally remain upstream of the facility’s chemical-injection equipment.

All chemical feeders, controllers, sensors, and secondary sanitation equipment must be positioned according to their manufacturers’ instructions and the approved facility design.

Air-Flow Requirements

The CCW500 requires approximately 40–55 LPM of treatment-air flow.

Air flow should be verified:

  • During initial startup
  • After cartridge replacement
  • After pump-speed changes
  • After plumbing modifications
  • After filtration service
  • During routine facility inspections
  • Whenever water-treatment performance changes

Potential causes of insufficient air flow include:

  • Restricted or kinked air tubing
  • Incorrect flowmeter adjustment
  • Dirty or restricted filters
  • Low circulation flow
  • Compressor malfunction
  • Blocked diffuser assemblies
  • Improper injection placement
  • Air leaks within the installation

Operating outside the recommended range can reduce treatment performance.

Annual Cartridge Exchange

The primary routine maintenance requirement is the annual exchange of both CCW500 cartridges.

Clear Comfort describes the procedure as an approximately 15-minute process that does not require lamps, specialized tools, professional servicing, or extended facility downtime.

The general process includes:

  1. Turn the CCW500 off
  2. Disconnect power from the system
  3. Disconnect the blue air tubing from both cartridges
  4. Disconnect the electrical cartridge connections
  5. Release the cartridge-retaining brackets
  6. Remove both cartridges
  7. Install both replacement cartridges
  8. Secure the retaining brackets
  9. Reconnect air tubing and electrical connections
  10. Restore power
  11. Adjust air flow to 40–55 LPM
  12. Verify system and cartridge-status indicators
  13. Return used cartridges through Clear Comfort’s exchange process

Cartridges should be replaced annually or according to the status indicators and Clear Comfort’s current service instructions.

Electrical Requirements

The CCW500 operates on either 120V or 240V, 60 Hz electrical power.

Commercial installation may require:

  • GFCI-protected electrical supply
  • Proper equipment grounding
  • Flow switch
  • Junction box
  • Air compressor
  • Current-sensor connection
  • Watertight conduit and fittings
  • Control that prevents operation without circulation

The system may be tied to the circuit controlling pump operation or connected to an appropriate GFCI-protected outlet.

All electrical work must be completed by a qualified professional in accordance with the unit specification label, installation instructions, and applicable codes.

Floor-Standing Installation

The CCW500 is a floor-standing system and should not be wall mounted.

The enclosure should be installed:

  • On a stable, level surface
  • In a clean and protected equipment area
  • Within 15 feet of the treatment-air injection point
  • Where the front doors can open completely
  • Where annual cartridge replacement can be performed
  • Away from direct water spray and irrigation
  • Within the recommended 40°F–90°F ambient range

The system may be secured to the floor where required for seismic safety or facility requirements.

Installation Requirements

Before installation, confirm:

  • The facility falls within the CCW500 application range
  • Maximum circulation flow does not exceed 2,000 GPM
  • Required 40–55 LPM air flow can be achieved
  • Adequate floor space is available
  • The system can be positioned within 15 feet of the injection point
  • Suitable electrical service is available
  • A proper flow switch and operating interlock can be installed
  • The injection point is located after the heater
  • Chemical injection remains correctly positioned downstream
  • A suitable inline or surge-pit diffuser configuration is available
  • Air tubing can be safely routed and protected
  • The equipment area remains within the recommended temperature range
  • The facility’s filtration and circulation systems meet required turnover rates
  • The installation complies with local health, building, plumbing, and electrical codes

Professional commercial installation is required.

Certifications and Recognition

The CCW500 carries manufacturer-listed certifications and registrations including:

  • NSF/ANSI 50 certification
  • UL 1563 certification
  • EPA establishment registration

Clear Comfort also lists industry recognition for the CCW500, including:

  • First-place sustainability recognition in the 2021 blooloop Innovation Awards
  • Aquatics International Most Valuable Product recognition

Certification scope and installation requirements should be reviewed for each regulated application.

Warranty

The current Clear Comfort commercial warranty provides:

  • Five-year limited warranty on the CCW500 system
  • One-year limited warranty on replacement cartridges

Coverage applies to the original purchaser and is subject to proper registration, installation, electrical supply, operation, maintenance, and Clear Comfort’s complete warranty terms.

Freight, site access, removal, reinstallation, labor, and related expenses may not be covered.

90-Day Money-Back Guarantee

The CCW500 may qualify for Clear Comfort’s limited 90-day money-back guarantee.

The purchaser must register for the guarantee before purchasing the system. The system must also meet Clear Comfort’s eligibility, condition, and return requirements.

The guarantee should not be represented as automatic unless the required pre-purchase registration has been completed.

What to Confirm Before Ordering

Before ordering the CCW500, confirm:

  1. Facility type
  2. Pool or attraction volume
  3. Maximum circulation flow
  4. Turnover rate
  5. Normal and peak bather load
  6. Primary sanitizer
  7. Current combined-chlorine levels
  8. Existing chemical-feed system
  9. Filtration type
  10. Heater location
  11. Available injection point
  12. Surge-pit design and access
  13. Electrical supply
  14. Equipment-room floor space
  15. Required diffuser or Venturi installation kit
  16. Air-tubing route
  17. Local health-code requirements
  18. Clear Comfort sizing and installation approval

Commercial sizing and installation should be reviewed with Clear Comfort before purchase.

Frequently Asked Questions

What is the CCW500 designed for?

The CCW500 is designed for large commercial pools, water parks, aquatic centers, and other high-bather-load recreational-water facilities.

What is the maximum treated water flow?

The published maximum circulation flow rate is 2,000 GPM.

What is the difference between the CCW300 and CCW500?

The CCW300 is designed for medium commercial pools and treats up to 700 GPM. The CCW500 is designed for large commercial pools and water parks and treats up to 2,000 GPM.

Does the CCW500 replace chlorine?

No. It supplements the facility’s required primary sanitizer and helps reduce the oxidation burden placed on that sanitizer.

How much treatment-air flow is required?

The recommended air-flow range is 40–55 LPM.

How is the CCW500 installed?

The system may use inline diffuser rods, surge-pit diffusers, a Venturi, or another approved air-compressor-assisted configuration.

Is the system wall mounted?

No. The CCW500 is a floor-standing system. It may be secured to the floor where required for seismic safety.

How much power does it consume?

The CCW500 uses approximately 120 watts.

How often are the cartridges replaced?

Both cartridges are generally exchanged annually through an approximately 15-minute maintenance process.

Does the system help reduce combined chlorine?

Yes. Clear Comfort positions the CCW500 to help reduce combined chlorine and other disinfection by-products when properly sized, installed, and operated.

Does Clear Comfort need to review the facility?

Yes. Large commercial systems should be reviewed with Clear Comfort before ordering to confirm sizing, installation method, air-flow requirements, and system configuration.

Need Help With Commercial Sizing?

Contact Summit Pool Supply for help gathering facility information and coordinating system selection with Clear Comfort.

Contact Summit Pool Supply by call or text at (866) 689-0086.

Description

Clear Comfort CCW500 Commercial AOP System

The Clear Comfort CCW500 is a hydroxyl-based Advanced Oxidation Process supplemental sanitation system designed for large commercial pools, water parks, aquatic centers, and other high-demand recreational-water facilities.

With treatment capacity for circulation flow rates up to 2,000 GPM, the CCW500 helps reduce chlorine demand, combined chlorine, chemical odors, and other disinfection by-products while supporting clearer water and a more comfortable aquatic environment.

The CCW500 operates alongside the facility’s required primary sanitizer, filtration, and circulation systems.

Why You’ll Love It

  • Designed for large commercial pools and water parks
  • Treats circulation flow rates up to 2,000 GPM
  • Patented hydroxyl-based AOP technology
  • Helps reduce chlorine and other chemical consumption
  • Helps control combined chlorine and disinfection by-products
  • Supports improved water and surrounding air quality
  • Helps protect against chlorine-resistant contaminants
  • Dual-cartridge design for increased treatment capacity
  • Works alongside existing primary sanitation systems
  • Inline diffuser, surge-pit diffuser, or Venturi installation options
  • Floor-standing commercial enclosure
  • Annual 15-minute cartridge exchange
  • Low 120-watt power consumption
  • NSF/ANSI 50 certified
  • UL certified
  • EPA establishment registered
  • Made in the USA
  • Five-year limited system warranty
  • Eligible for Clear Comfort’s pre-registered 90-day money-back guarantee

Commercial Supplemental Sanitation

The CCW500 supplements the facility’s required chlorine, bromine, or other approved primary sanitizer.

Clear Comfort’s patented AOP technology generates hydroxyl radicals that oxidize contaminants introduced by swimmers and the surrounding environment. This helps reduce the oxidation burden placed on the facility’s primary sanitizer.

The system can help address:

  • Organic contaminants
  • Combined chlorine
  • Chloramine-related odors
  • Oils and lotions
  • Other oxidizable contaminants
  • Disinfection by-products
  • Chlorine-resistant microorganisms

Required sanitizer residuals, turnover rates, filtration, testing, recordkeeping, and operational procedures must continue to comply with applicable health-code requirements.

Best Applications

The CCW500 is designed for large, heavily used commercial aquatic facilities, including:

  • Large commercial swimming pools
  • Water parks
  • Municipal aquatic centers
  • University and school aquatic facilities
  • Recreation centers
  • YMCAs and health clubs
  • Large hotel and resort pools
  • Competition pools
  • Professional athletic training facilities
  • Large therapy and rehabilitation pools
  • High-bather-load indoor pools
  • Commercial water attractions

Final system selection should account for circulation flow, water volume, turnover rate, bather load, operating hours, sanitizer demand, facility design, and installation method.

System Specifications

  • Model: CCW500
  • Application: Large commercial pools and water parks
  • Technology: Hydroxyl-based Advanced Oxidation Process
  • Maximum treated water flow: 2,000 GPM
  • Recommended treatment-air flow: 40–55 LPM
  • Electrical supply: 120V or 240V, 60 Hz
  • Electrical rating at 120V: 2.5A
  • Electrical rating at 240V: 1.25A
  • Approximate power consumption: 120 watts
  • Current-sensor operating range: 0.25A–15A
  • Dimensions: 47 inches high × 36 inches wide × 27 inches deep
  • Weight: Approximately 90 lb.
  • Mounting configuration: Floor standing
  • Included power cord: 10 feet
  • Recommended ambient temperature: 40°F–90°F
  • Maximum recommended distance from injection point: 15 feet
  • Country of manufacture: USA

The CCW500 should operate only while the facility’s circulation pump is running.

Dual-Cartridge Commercial Design

The CCW500 uses two treatment cartridges to provide the capacity required for large-scale aquatic applications.

The commercial enclosure includes:

  • Cartridge A
  • Cartridge B
  • Individual cartridge-status indicators
  • System power switch and indicator
  • Internal power supply
  • Voltage-specific ballasts
  • Current sensor
  • External adjustable flowmeter
  • Treated-air outlet
  • Lockable front doors

Both cartridges must be correctly installed, powered, and connected for the system to operate as designed.

The dual-cartridge layout also provides built-in treatment redundancy compared with a single-cartridge configuration.

Chlorine and Disinfection By-Product Reduction

Clear Comfort positions its commercial systems to help facilities:

  • Reduce chlorine and other chemical use
  • Improve control of combined chlorine
  • Reduce irritating chemical odors
  • Reduce unwanted disinfection by-products
  • Improve water clarity
  • Improve swimmer and staff comfort
  • Reduce chemical handling and storage demands
  • Stabilize overall water-care operation

Clear Comfort reports commercial chemical reductions of up to approximately 50% and disinfection by-product reductions of approximately 50%–90% in qualifying applications.

These are manufacturer-reported results rather than guaranteed outcomes. Actual performance depends on system sizing, installation, chemistry, filtration, circulation, bather load, operating procedures, and facility conditions.

Supplemental Protection Against Cryptosporidium

Clear Comfort reports third-party university testing demonstrating a 99.99% reduction of chlorine-resistant Cryptosporidium under the tested conditions.

The CCW500 remains a supplemental sanitation system. It does not eliminate the need to maintain the required primary sanitizer or follow applicable health-department procedures for contamination events, fecal incidents, testing, closure, or remediation.

Flexible Installation Options

The CCW500 can be integrated through several commercial injection methods:

  • Inline diffuser rod
  • Surge-pit diffuser
  • Venturi injection
  • Air-compressor-assisted injection

The correct method depends on the facility’s hydraulic design, return-pipe configuration, circulation flow, surge-pit layout, available space, and equipment-room conditions.

Clear Comfort or a qualified commercial aquatic professional should review the proposed application before the system and installation kit are ordered.

Inline Diffuser Installation

An inline diffuser installation introduces treated air directly into the main return plumbing.

The diffuser and flow switch are generally installed after the filter and heater, with the greatest practical distance from the chlorine-injection location.

A typical inline installation kit may include:

  • Diffuser rods
  • Air check valves
  • Air tubing
  • Air-compressor enclosure
  • Flow switch
  • Junction box
  • Flowmeter
  • Plumbing tools and installation components

The flow switch helps prevent the CCW500 from operating when circulation flow is not present.

The CCW500 should generally be positioned within 15 feet of the injection point, and air tubing should be kept as short and direct as practical.

Surge-Pit Diffuser Installation

Facilities equipped with a surge pit may introduce treated air through submerged diffuser assemblies.

For the CCW500, multiple diffusers are connected to the system through a splitter configuration.

Diffusers should generally be positioned:

  • Near the location where water enters the surge pit
  • Away from the circulation-pump suction
  • Where bubbles can disperse effectively
  • Where tubing can be protected from damage
  • Where components remain accessible for inspection and service

Surge-pit designs differ substantially between facilities. Clear Comfort should review the proposed diffuser quantity, placement, tubing route, and equipment configuration before installation.

Typical Plumbing Sequence

For an inline commercial installation, the general equipment sequence is:

Pool → Pump → Filter → Heater → Clear Comfort Injection Point → Chlorine Injection → Return to Pool

The Clear Comfort injection point should generally remain upstream of the facility’s chemical-injection equipment.

All chemical feeders, controllers, sensors, and secondary sanitation equipment must be positioned according to their manufacturers’ instructions and the approved facility design.

Air-Flow Requirements

The CCW500 requires approximately 40–55 LPM of treatment-air flow.

Air flow should be verified:

  • During initial startup
  • After cartridge replacement
  • After pump-speed changes
  • After plumbing modifications
  • After filtration service
  • During routine facility inspections
  • Whenever water-treatment performance changes

Potential causes of insufficient air flow include:

  • Restricted or kinked air tubing
  • Incorrect flowmeter adjustment
  • Dirty or restricted filters
  • Low circulation flow
  • Compressor malfunction
  • Blocked diffuser assemblies
  • Improper injection placement
  • Air leaks within the installation

Operating outside the recommended range can reduce treatment performance.

Annual Cartridge Exchange

The primary routine maintenance requirement is the annual exchange of both CCW500 cartridges.

Clear Comfort describes the procedure as an approximately 15-minute process that does not require lamps, specialized tools, professional servicing, or extended facility downtime.

The general process includes:

  1. Turn the CCW500 off
  2. Disconnect power from the system
  3. Disconnect the blue air tubing from both cartridges
  4. Disconnect the electrical cartridge connections
  5. Release the cartridge-retaining brackets
  6. Remove both cartridges
  7. Install both replacement cartridges
  8. Secure the retaining brackets
  9. Reconnect air tubing and electrical connections
  10. Restore power
  11. Adjust air flow to 40–55 LPM
  12. Verify system and cartridge-status indicators
  13. Return used cartridges through Clear Comfort’s exchange process

Cartridges should be replaced annually or according to the status indicators and Clear Comfort’s current service instructions.

Electrical Requirements

The CCW500 operates on either 120V or 240V, 60 Hz electrical power.

Commercial installation may require:

  • GFCI-protected electrical supply
  • Proper equipment grounding
  • Flow switch
  • Junction box
  • Air compressor
  • Current-sensor connection
  • Watertight conduit and fittings
  • Control that prevents operation without circulation

The system may be tied to the circuit controlling pump operation or connected to an appropriate GFCI-protected outlet.

All electrical work must be completed by a qualified professional in accordance with the unit specification label, installation instructions, and applicable codes.

Floor-Standing Installation

The CCW500 is a floor-standing system and should not be wall mounted.

The enclosure should be installed:

  • On a stable, level surface
  • In a clean and protected equipment area
  • Within 15 feet of the treatment-air injection point
  • Where the front doors can open completely
  • Where annual cartridge replacement can be performed
  • Away from direct water spray and irrigation
  • Within the recommended 40°F–90°F ambient range

The system may be secured to the floor where required for seismic safety or facility requirements.

Installation Requirements

Before installation, confirm:

  • The facility falls within the CCW500 application range
  • Maximum circulation flow does not exceed 2,000 GPM
  • Required 40–55 LPM air flow can be achieved
  • Adequate floor space is available
  • The system can be positioned within 15 feet of the injection point
  • Suitable electrical service is available
  • A proper flow switch and operating interlock can be installed
  • The injection point is located after the heater
  • Chemical injection remains correctly positioned downstream
  • A suitable inline or surge-pit diffuser configuration is available
  • Air tubing can be safely routed and protected
  • The equipment area remains within the recommended temperature range
  • The facility’s filtration and circulation systems meet required turnover rates
  • The installation complies with local health, building, plumbing, and electrical codes

Professional commercial installation is required.

Certifications and Recognition

The CCW500 carries manufacturer-listed certifications and registrations including:

  • NSF/ANSI 50 certification
  • UL 1563 certification
  • EPA establishment registration

Clear Comfort also lists industry recognition for the CCW500, including:

  • First-place sustainability recognition in the 2021 blooloop Innovation Awards
  • Aquatics International Most Valuable Product recognition

Certification scope and installation requirements should be reviewed for each regulated application.

Warranty

The current Clear Comfort commercial warranty provides:

  • Five-year limited warranty on the CCW500 system
  • One-year limited warranty on replacement cartridges

Coverage applies to the original purchaser and is subject to proper registration, installation, electrical supply, operation, maintenance, and Clear Comfort’s complete warranty terms.

Freight, site access, removal, reinstallation, labor, and related expenses may not be covered.

90-Day Money-Back Guarantee

The CCW500 may qualify for Clear Comfort’s limited 90-day money-back guarantee.

The purchaser must register for the guarantee before purchasing the system. The system must also meet Clear Comfort’s eligibility, condition, and return requirements.

The guarantee should not be represented as automatic unless the required pre-purchase registration has been completed.

What to Confirm Before Ordering

Before ordering the CCW500, confirm:

  1. Facility type
  2. Pool or attraction volume
  3. Maximum circulation flow
  4. Turnover rate
  5. Normal and peak bather load
  6. Primary sanitizer
  7. Current combined-chlorine levels
  8. Existing chemical-feed system
  9. Filtration type
  10. Heater location
  11. Available injection point
  12. Surge-pit design and access
  13. Electrical supply
  14. Equipment-room floor space
  15. Required diffuser or Venturi installation kit
  16. Air-tubing route
  17. Local health-code requirements
  18. Clear Comfort sizing and installation approval

Commercial sizing and installation should be reviewed with Clear Comfort before purchase.

Frequently Asked Questions

What is the CCW500 designed for?

The CCW500 is designed for large commercial pools, water parks, aquatic centers, and other high-bather-load recreational-water facilities.

What is the maximum treated water flow?

The published maximum circulation flow rate is 2,000 GPM.

What is the difference between the CCW300 and CCW500?

The CCW300 is designed for medium commercial pools and treats up to 700 GPM. The CCW500 is designed for large commercial pools and water parks and treats up to 2,000 GPM.

Does the CCW500 replace chlorine?

No. It supplements the facility’s required primary sanitizer and helps reduce the oxidation burden placed on that sanitizer.

How much treatment-air flow is required?

The recommended air-flow range is 40–55 LPM.

How is the CCW500 installed?

The system may use inline diffuser rods, surge-pit diffusers, a Venturi, or another approved air-compressor-assisted configuration.

Is the system wall mounted?

No. The CCW500 is a floor-standing system. It may be secured to the floor where required for seismic safety.

How much power does it consume?

The CCW500 uses approximately 120 watts.

How often are the cartridges replaced?

Both cartridges are generally exchanged annually through an approximately 15-minute maintenance process.

Does the system help reduce combined chlorine?

Yes. Clear Comfort positions the CCW500 to help reduce combined chlorine and other disinfection by-products when properly sized, installed, and operated.

Does Clear Comfort need to review the facility?

Yes. Large commercial systems should be reviewed with Clear Comfort before ordering to confirm sizing, installation method, air-flow requirements, and system configuration.

Need Help With Commercial Sizing?

Contact Summit Pool Supply for help gathering facility information and coordinating system selection with Clear Comfort.

Contact Summit Pool Supply by call or text at (866) 689-0086.

Shipping

Shipping Rates and Service Area

For eligible orders shipping within the contiguous United States:

  • Orders under $100 are charged a flat $14.99 standard shipping rate.
  • Orders of $100 or more receive free standard shipping.

The $100 threshold is based on the merchandise subtotal after discounts and before taxes.

Free shipping applies to eligible standard ground and freight shipments. Certain oversized, unusually heavy, freight/LTL, or specially handled products may require an additional shipping charge. Any applicable shipping charge will be displayed at checkout whenever possible.

If a required freight charge cannot be calculated automatically, our team will contact you with a shipping quote before the order is fulfilled.

Orders shipping to Alaska or Hawaii are not eligible for the contiguous United States flat-rate or free-shipping offer. Shipping charges for these destinations will be calculated at checkout whenever possible. If a freight quote is required, our team will contact you before fulfillment.

Order Confirmation

As soon as you place your order, you will receive an order-confirmation email. This means we have received your order in our system and pre-authorized your card.

We will then confirm that the ordered item is in stock and available to ship. If an item is backordered or unavailable, we will void the pre-authorization and contact you by email to discuss the available options.

If the item is available for shipment, we will process the charge and begin preparing the order.

Handling Time

In-stock orders generally ship within three business days from the date of the order. Business days exclude weekends and holidays.

Once your order ships, we will email shipping confirmation and available tracking information to the email address provided at checkout.

Order Cutoff Time

Orders received after 1:00 p.m. Pacific Time will be treated as having been received on the following business day for handling-time purposes.

Delivery Methods and Estimated Timeframes

  • Ground shipping transit time: 1–3 business days
  • Freight/LTL transit time: 3–10 business days
  • Estimated overall delivery window, including handling and transit: 4–13 business days

Delivery estimates are not guarantees and may be affected by product availability, carrier delays, severe weather, holidays, remote delivery locations, freight appointments, or other circumstances outside our control.

Order Shipment and Tracking

Once your order ships, we will send shipping confirmation and available tracking details to the email address used at checkout.

If you have not received shipping confirmation within four business days of placing your order, please contact us at sales@summitpoolsupply.com.

Freight Deliveries

Freight and LTL deliveries may require a delivery appointment. The carrier may contact you using the telephone number provided during checkout.

Please inspect all freight shipments before signing the delivery receipt. Note any visible damage on the delivery receipt or refuse the shipment if it appears severely damaged.

Damages

Please inspect the packaging and merchandise when your order is delivered.

If you notice damage, make a note of it with the carrier at the time of delivery or refuse the shipment. If you accept delivery, immediately photograph the packaging, shipping label, and all visible product damage.

Email the photographs and your order information to sales@summitpoolsupply.com, and then visit our Returns page to submit your claim.

Keep all original packaging and materials while the damage claim is being reviewed.

Questions

Need help with an order? Contact us at sales@summitpoolsupply.com.

Why Buy From Us

We get it. You've got a lot of choice when it comes to online retailers.
Here's why we think you should shop with us at Summit Pool Supply.

Free Shipping in the USA.

30 Day Easy Returns.

Great Service. We pride ourselves on the best service, anywhere.
Your Satisfaction Guaranteed. We handpick our products for quality, we
know you'll love them. But if there is ever something wrong, we'll fix it.

CA Prop 65 Warning

⚠️ WARNING: This product can expose you to chemicals including carbon monoxide and lead, which are known to the State of California to cause cancer and birth defects or other reproductive harm. For more information, go to www.P65Warnings.ca.gov.

Description

Clear Comfort CCW500 Commercial AOP System

The Clear Comfort CCW500 is a hydroxyl-based Advanced Oxidation Process supplemental sanitation system designed for large commercial pools, water parks, aquatic centers, and other high-demand recreational-water facilities.

With treatment capacity for circulation flow rates up to 2,000 GPM, the CCW500 helps reduce chlorine demand, combined chlorine, chemical odors, and other disinfection by-products while supporting clearer water and a more comfortable aquatic environment.

The CCW500 operates alongside the facility’s required primary sanitizer, filtration, and circulation systems.

Why You’ll Love It

  • Designed for large commercial pools and water parks
  • Treats circulation flow rates up to 2,000 GPM
  • Patented hydroxyl-based AOP technology
  • Helps reduce chlorine and other chemical consumption
  • Helps control combined chlorine and disinfection by-products
  • Supports improved water and surrounding air quality
  • Helps protect against chlorine-resistant contaminants
  • Dual-cartridge design for increased treatment capacity
  • Works alongside existing primary sanitation systems
  • Inline diffuser, surge-pit diffuser, or Venturi installation options
  • Floor-standing commercial enclosure
  • Annual 15-minute cartridge exchange
  • Low 120-watt power consumption
  • NSF/ANSI 50 certified
  • UL certified
  • EPA establishment registered
  • Made in the USA
  • Five-year limited system warranty
  • Eligible for Clear Comfort’s pre-registered 90-day money-back guarantee

Commercial Supplemental Sanitation

The CCW500 supplements the facility’s required chlorine, bromine, or other approved primary sanitizer.

Clear Comfort’s patented AOP technology generates hydroxyl radicals that oxidize contaminants introduced by swimmers and the surrounding environment. This helps reduce the oxidation burden placed on the facility’s primary sanitizer.

The system can help address:

  • Organic contaminants
  • Combined chlorine
  • Chloramine-related odors
  • Oils and lotions
  • Other oxidizable contaminants
  • Disinfection by-products
  • Chlorine-resistant microorganisms

Required sanitizer residuals, turnover rates, filtration, testing, recordkeeping, and operational procedures must continue to comply with applicable health-code requirements.

Best Applications

The CCW500 is designed for large, heavily used commercial aquatic facilities, including:

  • Large commercial swimming pools
  • Water parks
  • Municipal aquatic centers
  • University and school aquatic facilities
  • Recreation centers
  • YMCAs and health clubs
  • Large hotel and resort pools
  • Competition pools
  • Professional athletic training facilities
  • Large therapy and rehabilitation pools
  • High-bather-load indoor pools
  • Commercial water attractions

Final system selection should account for circulation flow, water volume, turnover rate, bather load, operating hours, sanitizer demand, facility design, and installation method.

System Specifications

  • Model: CCW500
  • Application: Large commercial pools and water parks
  • Technology: Hydroxyl-based Advanced Oxidation Process
  • Maximum treated water flow: 2,000 GPM
  • Recommended treatment-air flow: 40–55 LPM
  • Electrical supply: 120V or 240V, 60 Hz
  • Electrical rating at 120V: 2.5A
  • Electrical rating at 240V: 1.25A
  • Approximate power consumption: 120 watts
  • Current-sensor operating range: 0.25A–15A
  • Dimensions: 47 inches high × 36 inches wide × 27 inches deep
  • Weight: Approximately 90 lb.
  • Mounting configuration: Floor standing
  • Included power cord: 10 feet
  • Recommended ambient temperature: 40°F–90°F
  • Maximum recommended distance from injection point: 15 feet
  • Country of manufacture: USA

The CCW500 should operate only while the facility’s circulation pump is running.

Dual-Cartridge Commercial Design

The CCW500 uses two treatment cartridges to provide the capacity required for large-scale aquatic applications.

The commercial enclosure includes:

  • Cartridge A
  • Cartridge B
  • Individual cartridge-status indicators
  • System power switch and indicator
  • Internal power supply
  • Voltage-specific ballasts
  • Current sensor
  • External adjustable flowmeter
  • Treated-air outlet
  • Lockable front doors

Both cartridges must be correctly installed, powered, and connected for the system to operate as designed.

The dual-cartridge layout also provides built-in treatment redundancy compared with a single-cartridge configuration.

Chlorine and Disinfection By-Product Reduction

Clear Comfort positions its commercial systems to help facilities:

  • Reduce chlorine and other chemical use
  • Improve control of combined chlorine
  • Reduce irritating chemical odors
  • Reduce unwanted disinfection by-products
  • Improve water clarity
  • Improve swimmer and staff comfort
  • Reduce chemical handling and storage demands
  • Stabilize overall water-care operation

Clear Comfort reports commercial chemical reductions of up to approximately 50% and disinfection by-product reductions of approximately 50%–90% in qualifying applications.

These are manufacturer-reported results rather than guaranteed outcomes. Actual performance depends on system sizing, installation, chemistry, filtration, circulation, bather load, operating procedures, and facility conditions.

Supplemental Protection Against Cryptosporidium

Clear Comfort reports third-party university testing demonstrating a 99.99% reduction of chlorine-resistant Cryptosporidium under the tested conditions.

The CCW500 remains a supplemental sanitation system. It does not eliminate the need to maintain the required primary sanitizer or follow applicable health-department procedures for contamination events, fecal incidents, testing, closure, or remediation.

Flexible Installation Options

The CCW500 can be integrated through several commercial injection methods:

  • Inline diffuser rod
  • Surge-pit diffuser
  • Venturi injection
  • Air-compressor-assisted injection

The correct method depends on the facility’s hydraulic design, return-pipe configuration, circulation flow, surge-pit layout, available space, and equipment-room conditions.

Clear Comfort or a qualified commercial aquatic professional should review the proposed application before the system and installation kit are ordered.

Inline Diffuser Installation

An inline diffuser installation introduces treated air directly into the main return plumbing.

The diffuser and flow switch are generally installed after the filter and heater, with the greatest practical distance from the chlorine-injection location.

A typical inline installation kit may include:

  • Diffuser rods
  • Air check valves
  • Air tubing
  • Air-compressor enclosure
  • Flow switch
  • Junction box
  • Flowmeter
  • Plumbing tools and installation components

The flow switch helps prevent the CCW500 from operating when circulation flow is not present.

The CCW500 should generally be positioned within 15 feet of the injection point, and air tubing should be kept as short and direct as practical.

Surge-Pit Diffuser Installation

Facilities equipped with a surge pit may introduce treated air through submerged diffuser assemblies.

For the CCW500, multiple diffusers are connected to the system through a splitter configuration.

Diffusers should generally be positioned:

  • Near the location where water enters the surge pit
  • Away from the circulation-pump suction
  • Where bubbles can disperse effectively
  • Where tubing can be protected from damage
  • Where components remain accessible for inspection and service

Surge-pit designs differ substantially between facilities. Clear Comfort should review the proposed diffuser quantity, placement, tubing route, and equipment configuration before installation.

Typical Plumbing Sequence

For an inline commercial installation, the general equipment sequence is:

Pool → Pump → Filter → Heater → Clear Comfort Injection Point → Chlorine Injection → Return to Pool

The Clear Comfort injection point should generally remain upstream of the facility’s chemical-injection equipment.

All chemical feeders, controllers, sensors, and secondary sanitation equipment must be positioned according to their manufacturers’ instructions and the approved facility design.

Air-Flow Requirements

The CCW500 requires approximately 40–55 LPM of treatment-air flow.

Air flow should be verified:

  • During initial startup
  • After cartridge replacement
  • After pump-speed changes
  • After plumbing modifications
  • After filtration service
  • During routine facility inspections
  • Whenever water-treatment performance changes

Potential causes of insufficient air flow include:

  • Restricted or kinked air tubing
  • Incorrect flowmeter adjustment
  • Dirty or restricted filters
  • Low circulation flow
  • Compressor malfunction
  • Blocked diffuser assemblies
  • Improper injection placement
  • Air leaks within the installation

Operating outside the recommended range can reduce treatment performance.

Annual Cartridge Exchange

The primary routine maintenance requirement is the annual exchange of both CCW500 cartridges.

Clear Comfort describes the procedure as an approximately 15-minute process that does not require lamps, specialized tools, professional servicing, or extended facility downtime.

The general process includes:

  1. Turn the CCW500 off
  2. Disconnect power from the system
  3. Disconnect the blue air tubing from both cartridges
  4. Disconnect the electrical cartridge connections
  5. Release the cartridge-retaining brackets
  6. Remove both cartridges
  7. Install both replacement cartridges
  8. Secure the retaining brackets
  9. Reconnect air tubing and electrical connections
  10. Restore power
  11. Adjust air flow to 40–55 LPM
  12. Verify system and cartridge-status indicators
  13. Return used cartridges through Clear Comfort’s exchange process

Cartridges should be replaced annually or according to the status indicators and Clear Comfort’s current service instructions.

Electrical Requirements

The CCW500 operates on either 120V or 240V, 60 Hz electrical power.

Commercial installation may require:

  • GFCI-protected electrical supply
  • Proper equipment grounding
  • Flow switch
  • Junction box
  • Air compressor
  • Current-sensor connection
  • Watertight conduit and fittings
  • Control that prevents operation without circulation

The system may be tied to the circuit controlling pump operation or connected to an appropriate GFCI-protected outlet.

All electrical work must be completed by a qualified professional in accordance with the unit specification label, installation instructions, and applicable codes.

Floor-Standing Installation

The CCW500 is a floor-standing system and should not be wall mounted.

The enclosure should be installed:

  • On a stable, level surface
  • In a clean and protected equipment area
  • Within 15 feet of the treatment-air injection point
  • Where the front doors can open completely
  • Where annual cartridge replacement can be performed
  • Away from direct water spray and irrigation
  • Within the recommended 40°F–90°F ambient range

The system may be secured to the floor where required for seismic safety or facility requirements.

Installation Requirements

Before installation, confirm:

  • The facility falls within the CCW500 application range
  • Maximum circulation flow does not exceed 2,000 GPM
  • Required 40–55 LPM air flow can be achieved
  • Adequate floor space is available
  • The system can be positioned within 15 feet of the injection point
  • Suitable electrical service is available
  • A proper flow switch and operating interlock can be installed
  • The injection point is located after the heater
  • Chemical injection remains correctly positioned downstream
  • A suitable inline or surge-pit diffuser configuration is available
  • Air tubing can be safely routed and protected
  • The equipment area remains within the recommended temperature range
  • The facility’s filtration and circulation systems meet required turnover rates
  • The installation complies with local health, building, plumbing, and electrical codes

Professional commercial installation is required.

Certifications and Recognition

The CCW500 carries manufacturer-listed certifications and registrations including:

  • NSF/ANSI 50 certification
  • UL 1563 certification
  • EPA establishment registration

Clear Comfort also lists industry recognition for the CCW500, including:

  • First-place sustainability recognition in the 2021 blooloop Innovation Awards
  • Aquatics International Most Valuable Product recognition

Certification scope and installation requirements should be reviewed for each regulated application.

Warranty

The current Clear Comfort commercial warranty provides:

  • Five-year limited warranty on the CCW500 system
  • One-year limited warranty on replacement cartridges

Coverage applies to the original purchaser and is subject to proper registration, installation, electrical supply, operation, maintenance, and Clear Comfort’s complete warranty terms.

Freight, site access, removal, reinstallation, labor, and related expenses may not be covered.

90-Day Money-Back Guarantee

The CCW500 may qualify for Clear Comfort’s limited 90-day money-back guarantee.

The purchaser must register for the guarantee before purchasing the system. The system must also meet Clear Comfort’s eligibility, condition, and return requirements.

The guarantee should not be represented as automatic unless the required pre-purchase registration has been completed.

What to Confirm Before Ordering

Before ordering the CCW500, confirm:

  1. Facility type
  2. Pool or attraction volume
  3. Maximum circulation flow
  4. Turnover rate
  5. Normal and peak bather load
  6. Primary sanitizer
  7. Current combined-chlorine levels
  8. Existing chemical-feed system
  9. Filtration type
  10. Heater location
  11. Available injection point
  12. Surge-pit design and access
  13. Electrical supply
  14. Equipment-room floor space
  15. Required diffuser or Venturi installation kit
  16. Air-tubing route
  17. Local health-code requirements
  18. Clear Comfort sizing and installation approval

Commercial sizing and installation should be reviewed with Clear Comfort before purchase.

Frequently Asked Questions

What is the CCW500 designed for?

The CCW500 is designed for large commercial pools, water parks, aquatic centers, and other high-bather-load recreational-water facilities.

What is the maximum treated water flow?

The published maximum circulation flow rate is 2,000 GPM.

What is the difference between the CCW300 and CCW500?

The CCW300 is designed for medium commercial pools and treats up to 700 GPM. The CCW500 is designed for large commercial pools and water parks and treats up to 2,000 GPM.

Does the CCW500 replace chlorine?

No. It supplements the facility’s required primary sanitizer and helps reduce the oxidation burden placed on that sanitizer.

How much treatment-air flow is required?

The recommended air-flow range is 40–55 LPM.

How is the CCW500 installed?

The system may use inline diffuser rods, surge-pit diffusers, a Venturi, or another approved air-compressor-assisted configuration.

Is the system wall mounted?

No. The CCW500 is a floor-standing system. It may be secured to the floor where required for seismic safety.

How much power does it consume?

The CCW500 uses approximately 120 watts.

How often are the cartridges replaced?

Both cartridges are generally exchanged annually through an approximately 15-minute maintenance process.

Does the system help reduce combined chlorine?

Yes. Clear Comfort positions the CCW500 to help reduce combined chlorine and other disinfection by-products when properly sized, installed, and operated.

Does Clear Comfort need to review the facility?

Yes. Large commercial systems should be reviewed with Clear Comfort before ordering to confirm sizing, installation method, air-flow requirements, and system configuration.

Need Help With Commercial Sizing?

Contact Summit Pool Supply for help gathering facility information and coordinating system selection with Clear Comfort.

Contact Summit Pool Supply by call or text at (866) 689-0086.

Shipping

Shipping Rates and Service Area

For eligible orders shipping within the contiguous United States:

  • Orders under $100 are charged a flat $14.99 standard shipping rate.
  • Orders of $100 or more receive free standard shipping.

The $100 threshold is based on the merchandise subtotal after discounts and before taxes.

Free shipping applies to eligible standard ground and freight shipments. Certain oversized, unusually heavy, freight/LTL, or specially handled products may require an additional shipping charge. Any applicable shipping charge will be displayed at checkout whenever possible.

If a required freight charge cannot be calculated automatically, our team will contact you with a shipping quote before the order is fulfilled.

Orders shipping to Alaska or Hawaii are not eligible for the contiguous United States flat-rate or free-shipping offer. Shipping charges for these destinations will be calculated at checkout whenever possible. If a freight quote is required, our team will contact you before fulfillment.

Order Confirmation

As soon as you place your order, you will receive an order-confirmation email. This means we have received your order in our system and pre-authorized your card.

We will then confirm that the ordered item is in stock and available to ship. If an item is backordered or unavailable, we will void the pre-authorization and contact you by email to discuss the available options.

If the item is available for shipment, we will process the charge and begin preparing the order.

Handling Time

In-stock orders generally ship within three business days from the date of the order. Business days exclude weekends and holidays.

Once your order ships, we will email shipping confirmation and available tracking information to the email address provided at checkout.

Order Cutoff Time

Orders received after 1:00 p.m. Pacific Time will be treated as having been received on the following business day for handling-time purposes.

Delivery Methods and Estimated Timeframes

  • Ground shipping transit time: 1–3 business days
  • Freight/LTL transit time: 3–10 business days
  • Estimated overall delivery window, including handling and transit: 4–13 business days

Delivery estimates are not guarantees and may be affected by product availability, carrier delays, severe weather, holidays, remote delivery locations, freight appointments, or other circumstances outside our control.

Order Shipment and Tracking

Once your order ships, we will send shipping confirmation and available tracking details to the email address used at checkout.

If you have not received shipping confirmation within four business days of placing your order, please contact us at sales@summitpoolsupply.com.

Freight Deliveries

Freight and LTL deliveries may require a delivery appointment. The carrier may contact you using the telephone number provided during checkout.

Please inspect all freight shipments before signing the delivery receipt. Note any visible damage on the delivery receipt or refuse the shipment if it appears severely damaged.

Damages

Please inspect the packaging and merchandise when your order is delivered.

If you notice damage, make a note of it with the carrier at the time of delivery or refuse the shipment. If you accept delivery, immediately photograph the packaging, shipping label, and all visible product damage.

Email the photographs and your order information to sales@summitpoolsupply.com, and then visit our Returns page to submit your claim.

Keep all original packaging and materials while the damage claim is being reviewed.

Questions

Need help with an order? Contact us at sales@summitpoolsupply.com.

Why Buy From Us

We get it. You've got a lot of choice when it comes to online retailers.
Here's why we think you should shop with us at Summit Pool Supply.

Free Shipping in the USA.

30 Day Easy Returns.

Great Service. We pride ourselves on the best service, anywhere.
Your Satisfaction Guaranteed. We handpick our products for quality, we
know you'll love them. But if there is ever something wrong, we'll fix it.

CA Prop 65 Warning

⚠️ WARNING: This product can expose you to chemicals including carbon monoxide and lead, which are known to the State of California to cause cancer and birth defects or other reproductive harm. For more information, go to www.P65Warnings.ca.gov.